CALCULATION



Find out how much you may save in construction that includes the installation of prefabricated bathrooms.

A) Estimate the rough value of your savings in construction, including reducing costs on the construction site due to faster construction, for a period of three months.
(* in EUR))
1. Estimate of construction costs (electricity, water, waste management, box rental, security, etc.) for 3 months = EUR
2. Estimate of construction labour (wages) for 3 months = EUR
TOTAL COSTS associated with a construction site
0.00 EUR


B) Calculation of financing costs for 3-month long construction:
Annual interest rate = /100
Estimated value of a building = EUR
0.00 EUR


C) Input of approximate opportunity costs
Approximate opportunity costs (lost revenue due to time-consuming construction) per day: = EUR
0.00 EUR


My savings:
Amount A: 0.00 EUR
Amount B: 0.00 EUR
Amount C: 0.00 EUR
Total: 0.00 EUR